Below are a selection on instructions Dabinett have completed.
Property Types
Services
How We Helped We carried out a thorough inspection using specialist tools like thermal cameras to spot...
Our Approach Using specialist software and on-site techniques, our team carefully measured and calculated the accurate reinstatement...
Our Solution Our team mobilised quickly, deploying experienced surveyors to the site with precision measuring equipment. Surveys...
The refurbishment demanded a sensitive yet comprehensive approach to preserve the building’s heritage while modernising its fabric...
The existing roof was a timber structure, with large timber trusses, supporting purlins which supported rafters. Several...
The school needed to update the eixsting toilet blocks across the school. However, problems with the existing...
The dilapidation schedule was formerly served on the outgoing Tenant, who was resistant to any claim and...
It was essential that the condition report was issued promptly to allow completion of the lease. We...
Our client was a tenant in the property which also sublet a number of the premises and...
Over the course of several years and a number of projects Dabinett have provided a full Project...
The building comprised of numerours, structurally, independent roofs. Over the years renewal of roofs had been phased,...
The main site extended to approximately 35 acreas, with a variety of buildings which were to either...
With the lease term nearing its end Dabinett prepared a schedule of dilapidations and served this on the...
The existing roof of a 1960s apartment block was nearing the end of its life, replacement was...
We have completed hundreds of these instructions in the past, however this one was all the more...
Roof renewal was required to a block of 1950s properties, owned by a trust. The roof tiles...
The landlord wished Dabinett to assess end of lease liabilities and reach cash settlements for damages. On...
The existing roof to the building comprised of a timber roof, with timber joists, sterling board/OSB and...
During fire risk assessments being undertaken voids were found between floors where services ran through the building. ...
The tenant had been in occupation of two units since the early 2000s. There had been a...
Project Requirements The Client appointed Dabinett as the Building Owners Party Wall Surveyor to prevent and resolve...
A property was due to be handing back to the landlord by the tenant, there was significant...
Following a fire at a pub, the owner made a claim on the insurance. The insurers responded...
Our client received dilapidations claim following the exercising of a break clause in their lease of an...
The client needed to extend an existing, operational factory to meet demand and accommodate the growth of...
In advance of the proposed freehold acquisition of Maple Court, Dabinett was instructed by Webster Estates Ltd...
The property is a Grade II Listed former hospital. The long term future of the building involves...
Development of initial designs to achieve full planning and building regulations sign off for the development of...
Dabinett was instructed by Together to monitor the development of an existing mill building to form 50...
As part of the Housing Act 2004, housing within a Local Authorities borough should be inspected to...
Dabinett was instructed by St John Vianney School to prepare drawings and specifications for internal and external...
Dabinett was instructed to carry out a detailed condition survey to identify and quantify repairing liabilities ahead...
Instructed on the 8th August 2017 to complete a Summary Report of a two-storey detached Georgian style...
A regular private investor was seeking to acquire several apartments in the centre of Manchester. The reports...